Certifications & compliance

What we can document, and what we will not claim

EN 54, NFPA and local fire requirements, explained without pretending that one certificate covers every model or every market.

EN 54-16EN 54-24NFPA 72Local codes
Representative certificate overview

Representative certificates from our factory. Model-level certificates are supplied with the quotation.

The standards

Four routes, one rule: check the scope

A standard on a brochure is not a certificate for a model. The certificate, its scope and the accepting authority are checked before the offer is fixed.

EN 54-16

Voice alarm control and indicating equipment

The control equipment for a voice-alarm system: priority, monitoring, power and fault reporting. The certificate is model-specific.

EN 54-24

Loudspeakers for fire detection and fire alarm systems

Loudspeakers intended for voice-alarm use, including the enclosure and the transformer. A standard PA loudspeaker is not automatically EN 54-24.

NFPA 72

National Fire Alarm and Signaling Code

The US-origin code used in some markets. It covers the emergency communication system, intelligibility and monitoring. Local adoption varies.

Local codes

National and municipal requirements

Many markets use a local fire code or a civil defence authority’s practice. The accepted standard and the witness-test procedure are confirmed per project.

What we provide

Documentation, not adjectives

Certification is the most common source of misunderstanding in a fire-safety audio project. A factory may hold a certificate for one model, a brand may hold it for another, and the local authority may accept neither. The only safe approach is to check the certificate, its scope and the accepting authority before the order.

We provide the certificate scope for the models offered, the test reports where available and a written statement of what is covered. We do not describe a product as EN 54 certified unless the certificate covers the exact model and the intended use.

Our written position

  • We state the certificate holder and the model scope in the quotation.
  • We provide the datasheet and the certificate for the models offered.
  • We flag any model that cannot meet the requested standard.
  • We do not use the phrase “EN 54 ready” as a substitute for a certificate.
  • We do not claim a local approval we have not verified.
Request the document pack

Questions

Frequently asked questions

The questions that usually decide the scope: loudspeaker count, amplifier size, fire interface, certification and who installs the system. If your question is not here, send it with the building data.

Ask an application engineer

Is your whole range EN 54 certified?

No. Certification is model-specific. Some models are available with EN 54-16 or EN 54-24 documentation; others are not. The quotation lists the certificate scope for each model offered.

Can you provide a certificate of conformity?

We can provide the manufacturer’s certificate of conformity, the test report and the certificate scope where available. A certificate of conformity is not the same as a third-party EN 54 certificate; we do not present one as the other.

What if the local authority does not accept EN 54?

Then the local code and the authority’s practice apply. We ask for the clause and the acceptance route, and we confirm whether the proposed model can meet it. If it cannot, we say so before the order.

Do you provide the fire cause-and-effect matrix?

We provide the audio/voice-alarm side of the matrix and the interface list. The complete matrix is agreed with the fire-alarm supplier and the fire engineer. The commissioning test proves the agreed sequence.

Can you certify a private-label product?

A private label does not automatically transfer a certificate. The certificate holder and the scope depend on the factory, the model and the certification route. We confirm this before the private-label order.

One brief, one combined proposal

Send the building once. Get the whole system back.

Tell us the building type, zones, room sizes, ceiling height, seat or table count, fire interface and any ODM/OEM requirement. Our own factory and system team return one combined proposal: equipment schedule, interface list and open questions.

Reply within 48 hours · drawings welcome · no obligation